Doing the swap isn't a whole lot of work, it just takes time and things always go wrong. After I pulled the heads off, I decided to yank the shortblock as well. My oil pan had a leak so I figured now would be the time. Pulling the engine was very, very easy. It took me an hour to get it all of the way out. All it was was 6 motor mount bolts, remove some wiring harness loops,and remove the A/C compressor clutch and pulley so I can take the compressor off of the shortblock. I've been kind of rushing taking everything apart and I haven't been using labels or anything like that. I hope I can get it all back together.[&:]... Here are some pics from the swap so far...
*Here's the NPI Intake and the PI Intake: http://i144.photobucket.com/albums/r...10/PISwap5.jpg
*Here's the engine minus the intake:
http://i144.photobucket.com/albums/r...10/PISwap4.jpg
*Here's one of the heads fully disassembled:
http://i144.photobucket.com/albums/r...410/PISwap.jpg
*Here's my crappy T45:
http://i144.photobucket.com/albums/r...0315071614.jpg
*** I have a few more pics I'll post up soon with the engine out of the car...
*Here's the NPI Intake and the PI Intake: http://i144.photobucket.com/albums/r...10/PISwap5.jpg
*Here's the engine minus the intake:
http://i144.photobucket.com/albums/r...10/PISwap4.jpg
*Here's one of the heads fully disassembled:
http://i144.photobucket.com/albums/r...410/PISwap.jpg
*Here's my crappy T45:
http://i144.photobucket.com/albums/r...0315071614.jpg
*** I have a few more pics I'll post up soon with the engine out of the car...
#5
RE: PI swap is only half done...
ORIGINAL: 96GT226410
I'll do a step by step write up when I get done. I had some trouble finding a good one, so I figured that someone had to do it. ...
I'll do a step by step write up when I get done. I had some trouble finding a good one, so I figured that someone had to do it. ...
#6
RE: PI swap is only half done...
It's pretty straight foward, Andrew. There are a couple tricks I'll put in the write up that should help. If you want to do the PI swap, let me know. I can always come on down and help out. **Are you still down for the cruise on the 22nd? We may meet up with another group at the Durham Mall.
#9
RE: PI swap is only half done...
That's why I'm saving haha. I figure the PI intake is plenty, then I'll probably P&P some PI heads and get some VT Stage 1 cams. It's gonna be a while because I just have a Mustang savings account that I put a little in whenever I can so I can save up for stuff like that. I figure I'm looking at the whole job costing a good $2500 or so, but it'll be a brand new car after that. Then I get to start saving for the bottom end replacement and almost literally have a brand new car haha.
I'll have to think about the Durham thing, I'm already doing a Mustang get together the weekend before and a cruise at the beach the next weekend.
I'll have to think about the Durham thing, I'm already doing a Mustang get together the weekend before and a cruise at the beach the next weekend.
#10
RE: PI swap is only half done...
I'm looking at the whole job costing a good $2500
Heads: $300
P&P: $500
Intake: $250
You're going to need new valve covers depending on the type of PI heads you get, fluids, timing chain, sprockets, etc.