Search

Go Back   MustangForums.com > Photos > SALEEN_TIME's Profile > Albums
Sign in using an external account
Register Forgot Password?
Search

02 saleen project at its end
Some updated pics of it being finished for now. Will post the final pics the end of the week when the wheels are on and the new black stripe kit is put in place of the old silver. Finally!
side shot 6-24-09 dirty but almost finished, gotta put the black side stripe kit on
rear 6-24-09
6-24-09
tranny in with prothane tranny mount.
MM super subframe connecters, showing one finished being painted. Exhaust is bbk long tubes w/bbk off road h-pipe to 40 series flo's.
interior with red painted accents, pro 5.0 shifter. changing all gauges to black face brushed bezels.
Centerforce stage 3 clutch with fidanza 12lb flywheel
new brembo 13" cross drilled rotors up front with matching 10 1/2 drilled in the rear
The new wheels that are going on. So sick of chrome. Center caps are being painted solid black
My dss racing super pro mod motor with prothane motor mounts
Smoked headlights and airbrushing of the production #221
After the car was finished with paint and smoked tail lights along with airbrushing SALEEN in the bumper
Advertising

Featured Sponsors
Vendor Directory
New Sponsors
All times are GMT -5. The time now is 02:55 AM.

© Internet Brands, Inc.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2014, vBulletin Solutions, Inc.

This forum is owned and operated by Internet Brands, Inc., a Delaware corporation. It is not authorized or endorsed by the Ford Motor Company and is not affiliated with the Ford Motor Company or its related companies in any way. Ford® is a registered trademark of the Ford Motor Company
Emails Backup