2012 V6, New Canadian Owner!
#21
Well word has it on another forum that people who placed their orders more or less at the same time as I did would get theirs in maybe feb or march.
A recent recheck on that thread mentionned that they should be starting production and vin assignment next week if I recall correctly. However if that is true or not I don't know. Seemed to have been supported by a few members.
Let's be hopeful! And let's hope that taking a hardtop with no glass roof speeds up things for me T_T.
A recent recheck on that thread mentionned that they should be starting production and vin assignment next week if I recall correctly. However if that is true or not I don't know. Seemed to have been supported by a few members.
Let's be hopeful! And let's hope that taking a hardtop with no glass roof speeds up things for me T_T.
#22
While I'm here I'd like some feedback from 2010+ owners.
How's the backseat headroom like in those cars? It's not a major concern for me but I was curious. And it's impossible to test out with empty dealers LOL.
How's the backseat headroom like in those cars? It's not a major concern for me but I was curious. And it's impossible to test out with empty dealers LOL.
#24
Thanks LostBoyz.
As for updates. Someone in another forum is claiming that, his car that he ordered on Dec 29 has a build date of 2/21 and an estimated delivery date of 3/7.
I got my order placed on 1/5 so I'm hopeful of getting it in march :P.
As for updates. Someone in another forum is claiming that, his car that he ordered on Dec 29 has a build date of 2/21 and an estimated delivery date of 3/7.
I got my order placed on 1/5 so I'm hopeful of getting it in march :P.
#25
Hmm
Upsh1ft, my order was placed 11/30/2010 and I got "pulled" (VIN assigned) last Thursday. It'll be interesting to compare timelines as we go.
What forum was the other discussion at? Have a link? One thing I do not know is the lag between being pulled and being scheduled (to build).
What forum was the other discussion at? Have a link? One thing I do not know is the lag between being pulled and being scheduled (to build).
#26
Upsh1ft, my order was placed 11/30/2010 and I got "pulled" (VIN assigned) last Thursday. It'll be interesting to compare timelines as we go.
What forum was the other discussion at? Have a link? One thing I do not know is the lag between being pulled and being scheduled (to build).
What forum was the other discussion at? Have a link? One thing I do not know is the lag between being pulled and being scheduled (to build).
Not sure what the rules about linking to other forums are so I will play it safe.
#29
You'll wish he had never told you that. My dealer called me to say that it had been built and I should see it within a week or two (I live 40 min from flat rock). It took over a month, those last two weeks I was furious that my car was sitting on a lot 40 minutes away and that you pay $800+ in a destination fee. Though once it showed up and I drove it home, I didn't have a care in the world.
#30
You'll wish he had never told you that. My dealer called me to say that it had been built and I should see it within a week or two (I live 40 min from flat rock). It took over a month, those last two weeks I was furious that my car was sitting on a lot 40 minutes away and that you pay $800+ in a destination fee. Though once it showed up and I drove it home, I didn't have a care in the world.
Hopefully it arrives on time. I've been waiting since jan lol. Oh well like you said, once I drive it home I'll be satisfied. Now to find somewhere to do a ceremonial burnout.