Build Date?
#2
RE: Build Date?
My window sticker says 4-27-06 which is my blend date, whatever the heck that means.
Receipt Date: 3/15/2006
Serialize Date: 3/23/2006
Segment Date: 3/23/2006
Sequence Date: 4/21/2006
Blend Date: 4/27/2006
Produced Date: 5/5/2006
Gate Release Date: 5/5/2006
Ship Date: 5/5/2006
Arrival Date: 5/12/2006
Sold Date: 8/26/2006
Receipt Date: 3/15/2006
Serialize Date: 3/23/2006
Segment Date: 3/23/2006
Sequence Date: 4/21/2006
Blend Date: 4/27/2006
Produced Date: 5/5/2006
Gate Release Date: 5/5/2006
Ship Date: 5/5/2006
Arrival Date: 5/12/2006
Sold Date: 8/26/2006
#3
RE: Build Date?
blend date is not the build date.
Blend Date: The date that MP&L determines when the order will be built within the assigned day.
When they figure the specific order that vehicles will be built. This depends on options and line constraints.
Blend Date: The date that MP&L determines when the order will be built within the assigned day.
When they figure the specific order that vehicles will be built. This depends on options and line constraints.
#4
RE: Build Date?
I have two build dates! On the lower right of the MSRP sticker it says 02 16 06, and on my Oasis info it says Build Date: 2/25/06 I don't know....my door jamb sticker says 2/06, so at least I do know it was in Feb '06!!
#5
RE: Build Date?
ORIGINAL: JimsGT
I have two build dates! On the lower right of the MSRP sticker it says 02 16 06, and on my Oasis info it says Build Date: 2/25/06 I don't know....my door jamb sticker says 2/06, so at least I do know it was in Feb '06!!
I have two build dates! On the lower right of the MSRP sticker it says 02 16 06, and on my Oasis info it says Build Date: 2/25/06 I don't know....my door jamb sticker says 2/06, so at least I do know it was in Feb '06!!
#6
RE: Build Date?
here is what everything means:
Receipt Date: The date that MS&S recorded the order.
When the order is received from the dealers
Serialize Date: The date that MS&S transfers the order to MP&L and the VIN is created.
When the order is received by Material Planning and parts are ordered
Segment Date: The date that MP&L determines which week the order will be built.
When they figure what week that parts will be able to be delivered to the plant to build the vehicle
Sequence Date: The date that MP&L determines which day the order will be built.
When they figure what day that parts can be at the plant to build the vehicle
Blend Date: The date that MP&L determines when the order will be built within the assigned day.
When they figure the specific order that vehicles will be built. This depends on options and line constraints.
Produced Date: The date that VO finished assembling the vehicle
Your unit has been built!
Gate Release Date: The date that VO transfers the vehicle to Transportation Carriers for shipping
Your unit has left the building, and is in the hands of the shipper (rail or truck)
Ship Date: The date the vehicle left the Assembly Plant
Your unit has left the load site, and is on it's way to the dealer
Arrival Date: The date the Dealership received the vehicle
Your dealer has the unit in hand, doing the dealer prep thingy
Sold Date: The date the Customer picked up the vehicle
You came in, looked it over, said, "I'll take it!" and signed the papers
Receipt Date: The date that MS&S recorded the order.
When the order is received from the dealers
Serialize Date: The date that MS&S transfers the order to MP&L and the VIN is created.
When the order is received by Material Planning and parts are ordered
Segment Date: The date that MP&L determines which week the order will be built.
When they figure what week that parts will be able to be delivered to the plant to build the vehicle
Sequence Date: The date that MP&L determines which day the order will be built.
When they figure what day that parts can be at the plant to build the vehicle
Blend Date: The date that MP&L determines when the order will be built within the assigned day.
When they figure the specific order that vehicles will be built. This depends on options and line constraints.
Produced Date: The date that VO finished assembling the vehicle
Your unit has been built!
Gate Release Date: The date that VO transfers the vehicle to Transportation Carriers for shipping
Your unit has left the building, and is in the hands of the shipper (rail or truck)
Ship Date: The date the vehicle left the Assembly Plant
Your unit has left the load site, and is on it's way to the dealer
Arrival Date: The date the Dealership received the vehicle
Your dealer has the unit in hand, doing the dealer prep thingy
Sold Date: The date the Customer picked up the vehicle
You came in, looked it over, said, "I'll take it!" and signed the papers
Thread
Thread Starter
Forum
Replies
Last Post
AMAlexLazarus
AmericanMuscle.com
0
10-01-2015 09:21 AM