10 pt installed
well the 10 pt is installed and painted..car is at Diamond fabricating for new trans install..new radiator with all an fittings and 13 autometer ultra lite gauges to be installed..may need to rob a bank to restart saving for my engine..lol
Is that a mild steel cage? Looks nice and IMO you are doing it in the right order. I'd rather do the suspension/ cage and wait for a powerplant, than toss an engine in it and tear the interior apart a week later after the tracks won't let you run.
Thread
Thread Starter
Forum
Replies
Last Post
tj@steeda
Steeda Autosports
0
Sep 10, 2015 08:39 PM



