S197 Handling Section For everything suspension related, inlcuding brakes, tires, and wheels.

Installation estimate - Mitchell's Guide

Thread Tools
 
Search this Thread
 
Old Jul 16, 2011 | 01:03 PM
  #1  
MrLatte's Avatar
MrLatte
Thread Starter
 
Joined: Jan 2009
Posts: 27
From: WA
Question Installation estimate - Mitchell's Guide

I just got an estimate from a shop to install shocks, springs and an adjustable panhard bar. They told me from the Mitchell's guide the front is 1.5 hours per side (3 hours total) and the rear is about 3.6 hours (more because of the panhard bar).

Does this seem right? It seem high to me. I thought the rear is a lot easier and therefore should require less time. Are they doubling up the labor on the shocks and springs?

Any thoughts from others on what "official" times they've been given?
Old Jul 16, 2011 | 06:17 PM
  #2  
JAJ's Avatar
JAJ
2nd Gear Member
 
Joined: Nov 2010
Posts: 244
From: BC
Default

Well, I'm just an amateur, but the last time I took both my front struts out, disassembled them, reassembled them and reinstalled them it took me 55 minutes to do both sides. Of course, I only have a cheap spring compressor, so it slowed me down a bit. Oh, and I have ducted brakes so I had to remove the calipers and rotors to unbolt the brake backing plates so I could reach the lower knuckle bolt that's hidden behind the brake duct, and that slowed me down a bit, too.

So, yeah, three hours for a pro to do it sounds reasonable.

Originally Posted by MrLatte
I just got an estimate from a shop to install shocks, springs and an adjustable panhard bar. They told me from the Mitchell's guide the front is 1.5 hours per side (3 hours total) and the rear is about 3.6 hours (more because of the panhard bar).

Does this seem right? It seem high to me. I thought the rear is a lot easier and therefore should require less time. Are they doubling up the labor on the shocks and springs?

Any thoughts from others on what "official" times they've been given?

Last edited by JAJ; Jul 16, 2011 at 06:20 PM.
Old Jul 16, 2011 | 07:22 PM
  #3  
Tylus's Avatar
Tylus
5th Gear Member
 
Joined: Feb 2007
Posts: 2,211
From: Hawaii
Default

The front quote is well within standards. That is roughly how long it takes me to do in my driveway using jacks. I've done it on my car and my old F-150. 3-4 hours is a decent quote.

The rear is not. The panhard can be removed with the car sitting on the ground and using only 2 wrenches...same with the shocks. You have to move the carpet in the trunk out of the way slightly, but the rear end is so simple that realistically an amateur could expect about 1 hour for the shocks and panhard doing the workin their driveway.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
mtgldr
S197 Handling Section
5
Feb 3, 2024 09:00 PM
tj@steeda
Steeda Autosports
0
Sep 10, 2015 08:39 PM
SilverStallion05
General Tech
0
Sep 5, 2015 10:48 AM




All times are GMT -5. The time now is 03:10 PM.