2005-2014 Mustangs Discussions on the latest S197 model Mustangs from Ford.

My new build in progress....

Thread Tools
 
Search this Thread
 
Old Jun 8, 2011 | 07:05 AM
  #1  
one eyed willy's Avatar
one eyed willy
Thread Starter
5th Gear Member
 
Joined: Aug 2007
Posts: 2,263
From: Lakeland/Mulberry FL
Default My new build in progress....




My 550hp motor let go back in February, broke the oil pump at the track. 8.8:1 JE piston/manley rods,stock heads/cams......precision 67mm billet turbo around 15 PSI.Ran 11.3....


NEW motor is:
Livernois 298 stroker
9.1:1
mahle pistons
manley rods
Comp 127300 cams
new lash adjusters
newfollowers
All ARP hardware
all new hot side
meth fogger kit
Billet oil pump
tr6060 6 speed













Old Jun 8, 2011 | 07:05 AM
  #2  
one eyed willy's Avatar
one eyed willy
Thread Starter
5th Gear Member
 
Joined: Aug 2007
Posts: 2,263
From: Lakeland/Mulberry FL
Default

Also "shaved" the engine bay, welded in all the holes....re-routed all the wiring, tucked the fuse block under the dash....moved the battery to the trunk.....all the wiring was done 2 weeks prior to the old motor letting loose, so i know its all functioning properly!




















this is what the engine bay looked like after i did the wire tuck, before tearing it down for paint.....




Last edited by one eyed willy; Jun 8, 2011 at 07:09 AM.
Old Jun 8, 2011 | 07:06 AM
  #3  
one eyed willy's Avatar
one eyed willy
Thread Starter
5th Gear Member
 
Joined: Aug 2007
Posts: 2,263
From: Lakeland/Mulberry FL
Default

new turbo bracket...






new downpipe getting roughed in....








have to get some power steering lines extended....
Old Jun 8, 2011 | 07:07 AM
  #4  
one eyed willy's Avatar
one eyed willy
Thread Starter
5th Gear Member
 
Joined: Aug 2007
Posts: 2,263
From: Lakeland/Mulberry FL
Default

that about sums up the progress to this point!

whats left:

finish fabbing the hot side
get the hot side "jet hot" coated
alter the valve covers for the breather fittings (weld on some #10 bungs)
add breather cans - one to each side
order tr6060
order clutch
put the engine bay all back together
install motor & tranny
install meth kit
finish up some additional wiring

TUNING!!!!
Old Jun 8, 2011 | 08:01 AM
  #5  
2005Redfire6's Avatar
2005Redfire6
6th Gear Member
 
Joined: Jul 2008
Posts: 12,259
From: Acworth, GA
Default

Paul, looking forward to seeing it all put back together!
Old Jun 8, 2011 | 08:46 AM
  #6  
Riptide's Avatar
Riptide
6th Gear Member
 
Joined: Nov 2007
Posts: 6,193
From: Montaner
Default

/jealousy
Old Jun 8, 2011 | 09:52 AM
  #7  
Caution's Avatar
Caution
5th Gear Member
 
Joined: Nov 2006
Posts: 4,132
From: California
Default

Sweet bro! Looks good so far.
Old Jun 8, 2011 | 10:21 AM
  #8  
2007CalSpec's Avatar
2007CalSpec
5th Gear Member
 
Joined: Sep 2007
Posts: 2,059
From: Nor Cali
Default

Very cool! That's quite a project you've got there. How do you find the time to do all of this? Wish I had the time, energy, and money to do this kind of stuff.
Old Jun 8, 2011 | 11:35 AM
  #9  
Alec's Avatar
Alec
5th Gear Member
 
Joined: Aug 2009
Posts: 4,256
From: Philadelphia, PA
Default

Jesus christ
Old Jun 8, 2011 | 03:09 PM
  #10  
VistaBlue's Avatar
VistaBlue
2nd Gear Member
 
Joined: Jul 2009
Posts: 380
From: Maryland
Default

Originally Posted by Alec
Jesus christ
It's like you took the words I was mouthing as I went through the pictures and posted them.



All times are GMT -5. The time now is 07:58 PM.