GT500 Air Ride Installation Complete
#12
Wow nice work there!
But it is much too low for my taste even though you did a GREAT job.
Congrats man!
And how the HELL do you not hit bottom on almost EVERYTHING you come across on the road like speed bumps etc?
BTW I ordered a signed dash plaque like yours.
It has been about five months so mine should come in ANY time now.
Did you go over yours with a clear coat to protect the signature from fading with time?
But it is much too low for my taste even though you did a GREAT job.
Congrats man!
And how the HELL do you not hit bottom on almost EVERYTHING you come across on the road like speed bumps etc?
BTW I ordered a signed dash plaque like yours.
It has been about five months so mine should come in ANY time now.
Did you go over yours with a clear coat to protect the signature from fading with time?
#13
I just raise it up and problem solved. It will go 2in higher than stock if I really want it to
#19
1-10 10 being the hardest I would say 6ish. It really wasn't that bad. It's a basic suspension swap with the exception of running some air lines. The hardest part for me was the wiring since I'm more mechanically inclined the electrically. All of the work was more timely and tedious then difficult