8pt
me too haha
yea...this is my thought process at the moment..i just finished my 2yrs at a community college, now im steppng up to a university to finish my degree, so the cost is all going up...ive only got a few more major things to pick up, ide say it will be running by hopefully april, but im not sure its hitting the streets...ill still need to get the driveshaft shortened, and get new tires and all kinds of little stuff that all ads up...i dropped $300 today to buy some riding gear so i dont die on my street bike lol, there goes half my fuel system...if all goes as planned though, ill be ordering the fuel system as soon as the cage is done, then when tax return hits ill order my radiator...then she should be good to go minus the rest of my exuast, driveshaft, and tires...not going to rush it...it'll get done eventually, and when it does it will be worth it!!
me too haha
yea...this is my thought process at the moment..i just finished my 2yrs at a community college, now im steppng up to a university to finish my degree, so the cost is all going up...ive only got a few more major things to pick up, ide say it will be running by hopefully april, but im not sure its hitting the streets...ill still need to get the driveshaft shortened, and get new tires and all kinds of little stuff that all ads up...i dropped $300 today to buy some riding gear so i dont die on my street bike lol, there goes half my fuel system...if all goes as planned though, ill be ordering the fuel system as soon as the cage is done, then when tax return hits ill order my radiator...then she should be good to go minus the rest of my exuast, driveshaft, and tires...not going to rush it...it'll get done eventually, and when it does it will be worth it!!
little more glassing and sanding to be done before paint...and yes, both sides are boxed and glassed, i only took pics of one side though


finally ordered my fuel system

most of the system is already plumbed....once the engine bay is done, it should be going right together....not including chassis work, but the drivetrain needs to be in it for that anyways
going to get it running on a v6 radiator and fan, just to get the engine broke in so i can put in my other valve springs....ill upgrade to an aluminum and dual electric fans with my income tax...mainly focused on firing it up...the rest will fall into play little by little
hopefully we get to hear it run within the next month or so...not gonna get my hopes up, but thats the goal...ran outta glass so thats going to be a big hang up also. who knows how long it will take to get this time


finally ordered my fuel system

most of the system is already plumbed....once the engine bay is done, it should be going right together....not including chassis work, but the drivetrain needs to be in it for that anyways
going to get it running on a v6 radiator and fan, just to get the engine broke in so i can put in my other valve springs....ill upgrade to an aluminum and dual electric fans with my income tax...mainly focused on firing it up...the rest will fall into play little by little
hopefully we get to hear it run within the next month or so...not gonna get my hopes up, but thats the goal...ran outta glass so thats going to be a big hang up also. who knows how long it will take to get this time
Last edited by 99BlackPonyGT; Jan 6, 2010 at 02:39 PM.
I forgot to mention, I think it is AWESOME what you are doing to the car, I can't wait to see/hear about it when its done bro... Not to be redundant, as it probably was already covered in the thread but what are your goals power wise?