Update on my build
#1
Update on my build
Well I'm definitely starting to come to the end of the build...so far this is everything I have done:
Stock 97 GT block bored .20
Forged Manley 18cc pistons
Forged 8 bolt cobra crank/8 bolt flexplate
forged Manley rods
All ARP hardware (2000 bolts, headstuds,mainstuds,cam bolts,crank bolt)
MMR stage 3 PI heads
Crower high lift valve springs
CMS stage 3 blower cams
Edelbrock Victor Jr. EFI manifold (port matched to my heads)
4 " power pipe
Paxton Front Mount intercooler
Vortech mini race bypass valve
IW 10% od crank pulley
SLP longtbues,off road midpipe, catback
BR7EF plugs
new K&N filter
MSD coil packs/wires
one Walbro 255lph in tank pump
Siemen 60# injectors
Edelbrock high flow fuel rails
4.10 gears
Built AODE w/ BC auto 3500 stall
Huge tranny cooler
Complete built suspension
MT ET Street Radials 275/60/15 wrapped around Pro stars
Still has to get done:
End of this week sending out my SQ S trim to be upgraded to the SI trim, having a 2.95 8 rib blower pulley put on
6061 plenum
Accufab 75mm throttle body
Rest of 8 rib pulley setup
SCT BA3000 MAF
Motor Mounts
Finish up the fuel setup
That about wraps up the build, I'm thinking come November/December the motor should be in the car and I can start putting some miles on her over the winter so that come spring she can see the dyno
Stock 97 GT block bored .20
Forged Manley 18cc pistons
Forged 8 bolt cobra crank/8 bolt flexplate
forged Manley rods
All ARP hardware (2000 bolts, headstuds,mainstuds,cam bolts,crank bolt)
MMR stage 3 PI heads
Crower high lift valve springs
CMS stage 3 blower cams
Edelbrock Victor Jr. EFI manifold (port matched to my heads)
4 " power pipe
Paxton Front Mount intercooler
Vortech mini race bypass valve
IW 10% od crank pulley
SLP longtbues,off road midpipe, catback
BR7EF plugs
new K&N filter
MSD coil packs/wires
one Walbro 255lph in tank pump
Siemen 60# injectors
Edelbrock high flow fuel rails
4.10 gears
Built AODE w/ BC auto 3500 stall
Huge tranny cooler
Complete built suspension
MT ET Street Radials 275/60/15 wrapped around Pro stars
Still has to get done:
End of this week sending out my SQ S trim to be upgraded to the SI trim, having a 2.95 8 rib blower pulley put on
6061 plenum
Accufab 75mm throttle body
Rest of 8 rib pulley setup
SCT BA3000 MAF
Motor Mounts
Finish up the fuel setup
That about wraps up the build, I'm thinking come November/December the motor should be in the car and I can start putting some miles on her over the winter so that come spring she can see the dyno
#3
Jesus christ lol...ill put miles on the motor for ya . Lol im wantin a blower now SOOO bad since i can actually handle it...BUT then i remember that things cost money haha.. OOPS.
Sounds like a SICK build...should sound friggin sick!
Sounds like a SICK build...should sound friggin sick!
#8
Thread
Thread Starter
Forum
Replies
Last Post
AMAlexLazarus
AmericanMuscle.com
0
10-01-2015 09:21 AM