JTB's Build Thread:
#41
Well everyone here are a few of the last pics taken of the build. I have a video too, so as soon as I can get it to upload with sound I'll post it as well! Fixing a small coolant leak tomorrow, exhaust appt on thursday and dyno time after that!
All painted up and ready to go.
Seat delete, with nitrous bottle and heater.
motor about to be dropped in.
Built Trans from hughes, along with a converter from them.
After 8 months it finally fired! Pretty excited as this was my first real "hot rod build" and was 100% my vision, my choices, and my selections. I'm still waiting on my bbk 78mm tb unit in the mail, along with my fuel injector harness adaptors before we go to the dyno. I may also do an EGR delete, but we will see. I'll try to get some more pictures of the engine bay once I have a real camera, these are just from the cell phone. Let me know what you guys think!
All painted up and ready to go.
Seat delete, with nitrous bottle and heater.
motor about to be dropped in.
Built Trans from hughes, along with a converter from them.
After 8 months it finally fired! Pretty excited as this was my first real "hot rod build" and was 100% my vision, my choices, and my selections. I'm still waiting on my bbk 78mm tb unit in the mail, along with my fuel injector harness adaptors before we go to the dyno. I may also do an EGR delete, but we will see. I'll try to get some more pictures of the engine bay once I have a real camera, these are just from the cell phone. Let me know what you guys think!
Last edited by jtb727; 04-15-2013 at 10:14 PM.
#44
its a 3200 stall, I wanted it to stall about the same point as the nitrous kicks in, they said it will be closer to 33-3400 on the spray. I'm going to do a 100 shot first, and see where it gets me. and climb from there. ALT bracket is also blue.
Thread
Thread Starter
Forum
Replies
Last Post
AMAlexLazarus
AmericanMuscle.com
0
10-01-2015 09:21 AM