updates: 1/12/06
now most of the car is seam sealed, which isn't really fun to do. also, the subframe connectors arrived and the driver's side has been installed (bolted and welded). i brought my doors and hood to the sandblast guy this morning and should get those back tomorrow.








WOW! What a clean looking job. Thanks for the update....keep the pics coming, and give us some details of how to do all the work. Keep a log with pics to be included in the archives of How-To's.
Here is some pictures of my subframe connector installation.

I waited these weld on connectors long time and then intallation needed floor cutting. My friend re-desingned connectors and as you see now they will fit w/o any cutting.

Connectors are also welded to the floor with 15 spots.

Here they are and color is still wet.

I waited these weld on connectors long time and then intallation needed floor cutting. My friend re-desingned connectors and as you see now they will fit w/o any cutting.

Connectors are also welded to the floor with 15 spots.

Here they are and color is still wet.
Thread
Thread Starter
Forum
Replies
Last Post
pcm2a
5.0L (1979-1995) Mustang
18
Feb 18, 2012 11:49 AM
sr20sean
Members Other Vehicles
0
Apr 21, 2011 11:52 PM




