SFC?
I met a guy at a Midas shop that does awesome welding. Some of these guys weld all day long. When I need something like that welded, he does it on the side and I just give him little cash. I would give him around $40-50 for welding sub frames in.
I am actually in the process of making some in auto. I basically used this guide:
http://www.mustangandfords.com/howto...me_connectors/
Made the 2 straight connectors. 2" square tubing @ 48" long. 10" connecting to front framerails, 5 " in the rear. All brackets are cut, underbody of car is prepped. I was planning on installing them in the shop tomorrow, but I decided to sprain my shoulder when I ae sh*t on my mountainbike yesterday. Now I'll have to wait at least a week. I'm a saaad panda.
http://www.mustangandfords.com/howto...me_connectors/
Made the 2 straight connectors. 2" square tubing @ 48" long. 10" connecting to front framerails, 5 " in the rear. All brackets are cut, underbody of car is prepped. I was planning on installing them in the shop tomorrow, but I decided to sprain my shoulder when I ae sh*t on my mountainbike yesterday. Now I'll have to wait at least a week. I'm a saaad panda.
Thread
Thread Starter
Forum
Replies
Last Post




